Err

livraison
Contact
Paiement Livraison rapide Contactez-nous
Inscrivez-vous à notre Newsletter

TEROSON PU 8597 HLMC IN 310 ML CARTRIDGE

(Code: 02-99004-01)

Data Sheet
22.11 €
Discontinued Product
Add to cart
TEROSON PU 8597 HLMC IN 310 ML CARTRIDGE

TEROSON PU 8597 HLMC - CARTRIDGE 310 ML



Teroson PU 8597 HMLC is a 1-component polyurethane adhesive with high shear modulus and low conductivity.



Characteristics
The direct glazing adhesive is outstanding for the following properties:
  • Very good sag resistance
  • High cure rate
  • High elastic and shear strength, even after aging
  • Very low conductivity
  • Good adhesion to the remaining material
  • Excellent adhesion to glass, glass with the ceramic coating,encapsulation and to painted surfaces, in connection withprimer/activator
  • High UV resistance in connection with primer/activator
  • High shear modulus


Application

TEROSON PU 8597 HMLC is used for the bonding of front, rear and side screens to the body of motor-, utility-, special- and rail vehicles.

Technical characteristics
  • Colour : black
  • Odour : weak
  • Consistency : smooth, sag-resistant, pasty
  • Density : approx. 1.25 g/cm3
  • Solids : 100%
  • Curing mechanism : humidity curing
  • Cure rate (DIN 50014 ; 23°C, 50% rh) : approx. 3 to 4 mm/24 hrs
  • Shore-A-hardness (DIN 53505): approx. 70
  • Tensile strength (DIN 53504): approx. 9.5 MPa
  • Stress (DIN 53504): approx. 4 MPa at 100 % elongation
  • Shear modulus (DIN 54451): approx. 2.9 MPa
  • Elongation at break (DIN 53504): approx. 350 %
  • Shear strength
        after 24h (DIN 54451) : 2.0 MPa
        Layer thickness 5 mm based on DIN 54451 : 5 to 6 MPa (fully cured)
  • Specific forward resistance (ASTM D 257-99 / DIN IEC 60093) : approx. 1×1010 ω cm
  • Volume change (DIN 52451) : < 1 %
  • Glazing time* : approx. 18 mins
  • Material application temperature : +5°C to +35°C
  • Environmental temperature at application : -10°C to +45°C
  • In service temperature range : -40°C to +90°C
        short exposure (up to 1 hr.) : +120°C
* period of time between beginning of material application until inserting of the pane